November 18, 2017

Go Back   FlyFishingInNH.com Forum > Conservation Section > Conservation Issues

Reply
 
Thread Tools Display Modes
  #1  
Old 06-08-2012, 10:07 AM
Solid's Avatar
Solid Solid is offline
Senior Member
 
Join Date: Mar 2005
Location: Manchester, NH
Posts: 1,536
Send a message via AIM to Solid
Thumbs up A Big Moment for the Penobscot River.

Maine’s largest and arguably most impressive river, the Penobscot, is about to take a major leap toward a new future — and what a grand future it will be. As removal of the Great Works Dam begins this Monday, I will be there to celebrate the Penobscot and the significant benefits that the revitalized river will provide for generations to come.

Born and raised in Bangor, I’ve had a lifelong relationship with the Penobscot. As a child, I remember experiencing the stench of a still polluted river and hearing stories of a legendary Atlantic salmon fishery and presidential salmon tradition that no longer existed. As a professional river guide, I spent countless hours running rapids and paddling canoes and rafts on the West Branch. As an outdoor leadership instructor, I have taught hundreds of students about the power and beauty of Maine’s rivers, including the Penobscot. And as a board member of the Natural Resources Council of Maine, I have watched the Penobscot River Restoration Project since its inception — and have witnessed how two dam removals in the Kennebec watershed have resulted in a rebirth for that great river, offering a hint of what we can expect for the Penobscot.

As heavy machinery moves in to remove sections of the Great Works Dam this week, it is fitting to pay tribute to the dam’s history. Along with other dams on the Penobscot, it provided power for mills and factories that spurred the local economy and provided meaningful jobs manufacturing wood products, pulp and paper, shoes, canoes and clothing — all of which were produced in Old Town. This heritage is part of Maine’s story and should be held up and honored for having bettered the lives of thousands of people over the past century.

But dams also have taken a toll on our rivers. Maine’s rivers once served as open waterways for millions of sea-run fish migrating from the Gulf of Maine to spawning habitat deep inland, but the damming of our rivers — Maine has an estimated 1,000 dams — was like just so many brick walls. Runs of salmon, shad, alewives and other species plummeted as dams proliferated and few of these dams included any form of fish passage.

The fate of these fish wasn’t much of a concern during the decades when our rivers were treated like open sewers for industrial waste, but the federal Clean Water Act has brought us a long way since then. We now have an opportunity to restore sea-run fish populations to our rivers and to strengthen the traditions and recreational and economic opportunities that go hand in hand with healthy rivers. Doing so requires finding the right balance between our continuing need for renewable energy and our growing aspirations for healthy rivers.

The Penobscot River Restoration Project provides just such a balance because it will significantly improve access for 11 species of sea-run fish to nearly 1,000 miles of historic river habitat while maintaining current levels of power generation. Although the Great Works and Veazie dams will be removed as part of the project, and the Howland dam will be decommissioned, the Penobscot River Agreement provides for increased power generation at six existing dams, resulting in no loss of total power production.

It has taken many years and great efforts by a broad coalition to get to this point in the Penobscot’s history, and we should all take note of this remarkable collaboration. State and federal agencies, local and national organizations, the Penobscot Indian Nation and the dam owners, residents and communities along the river and donors from Maine and beyond — all have played a critical role in getting us to Monday’s big moment.

And it’s not just about the fish, as we know from recent experience. Two dam removals on the Kennebec River have shown that select dam removals can have many benefits. Removal of the Edwards Dam (Augusta) in 1999 and the Fort Halifax dam (Winslow) in 2007 have resulted in the largest run of alewives in the country, with more than 2 million returning to the Sebasticook in the past few weeks alone. This annual run draws bald eagles, osprey and many other wildlife, and also lobstermen who harvest valuable local baitfish instead of purchasing bait from out of state. And economists have demonstrated that removal of the Edwards Dam, which has helped the Kennebec reach its healthiest level in more than a century, has boosted property values for waterfront landowners and made it an increasingly attractive destination for a broad range of activities.

Seeing what has happened on the Kennebec makes me particularly excited for the Penobscot. As an NRCM board member, I am proud of the role we have played in helping this project move forward, and as a resident of Maine I am proud of what this project means for a river that has given us so much for so many generations. As the cribwork is removed, we will be giving something back — and that gift will help nourish the river and the people of Maine for generations to come.


From Bangor Daily News.
http://bangordailynews.com/2012/06/0...nobscot-river/
__________________
"Accept fun. Put on some music. Dance with your vacuum. If accomplishing chores, abnormally concrete ones, consistently try to accumulate your affection and activity up!" - annawilliam
Reply With Quote
  #2  
Old 06-08-2012, 08:06 PM
RichShady603 RichShady603 is offline
Senior Member
 
Join Date: Feb 2005
Location: Manchester N.H.
Posts: 760
Default

Nice... Thanks for posting that
Reply With Quote
  #3  
Old 08-01-2012, 11:39 AM
mr.scott mr.scott is offline
Junior Member
 
Join Date: Jul 2012
Location: nh
Posts: 14
Default

that's great news, thanks for sharing
Reply With Quote
  #4  
Old 08-01-2012, 12:11 PM
Addicted's Avatar
Addicted Addicted is offline
Member
 
Join Date: Aug 2009
Posts: 45
Default

good to hear.. thanks for posting
Reply With Quote
  #5  
Old 01-05-2013, 11:11 PM
B Horton B Horton is offline
Junior Member
 
Join Date: Nov 2011
Location: NH Seacoast
Posts: 18
Default

I never knew about this. Thank you, 5 years ago, for the post! I found this update from the same Bangor paper posted this past June...

http://bangordailynews.com/2012/06/1...funds-pledged/

It states, "Demolition is scheduled to be completed in November". Did this happen?
Reply With Quote
  #6  
Old 01-06-2013, 09:24 AM
FurFace's Avatar
FurFace FurFace is offline
Senior Member
 
Join Date: Oct 2011
Location: In my heart, Montana... In reality Arundel, ME
Posts: 413
Default

That's awesome, thanks for sharing it. Only wish that this would happen on other New England rivers. Hopefully the new Kennebec and Penobscot will spur other states (and Maine) to restore the former grandeur of other rivers.
I've often sat by the banks of the Androscoggin and pondered what it was like before all of the dams. What it must have been like when Atlantic Salmon ran up the river in massive spawning runs.? What were the Shelburne Falls like before the hydro dam was put in place? There was also a tremendous waterfall at the Berlin Mills location which was altered with the building of the Brown Co. paper mill. So wish we could somehow look back in time to see what it used to be. There's no going back, but there is looking forward.
Reply With Quote
  #7  
Old 01-06-2013, 04:49 PM
Wind Knot Wind Knot is offline
Member
 
Join Date: Jul 2011
Location: Amherst, NH
Posts: 56
Default

Mention of the Androscoggin River brought back some memories. I grew up in the Brunswick-Topsham area of Maine and crossed the Andy on a frequent, if not daily, basis. I remember well, the smell and color of the water. The river would sometimes change color depending on what dyes the upstream mills were dumping into it. The Brunswick-Topsham dam was the last one before the river entered tidal water. The dam was replaced (in 1983 I believe) and a fishway put in to allow upstream movement of shad, salmon etc. It's an interesting story that has met with partial success. The link below goes to the Maine DMR site and has some interesting information and statistics about the Atlantic Salmon restoration program.

WK

http://www.maine.gov/dmr/searunfish/...ramework.shtml
Reply With Quote
  #8  
Old 01-06-2013, 08:39 PM
bushbuck's Avatar
bushbuck bushbuck is offline
Senior Member
 
Join Date: Jan 2009
Location: Bow
Posts: 2,217
Default

WK, I remember the Merrimack in Manchester the same. I still remember when there was a canal where canal street is now, and the colors of die from the mills, raw sewage, and blood from the meat house being dumped in the river. The canal was pretty nasty to with all the junk, trash and I even watched them pull a body out of there as a kid.

I also have to say the Andro thru Berlin is a heck of a lot better to, you could even smell Berlin from Whitefield when the wind was right. I think sometimes we forget the advancements we have made, although we have much further to go.
Reply With Quote
  #9  
Old 01-06-2013, 08:53 PM
RichShady603 RichShady603 is offline
Senior Member
 
Join Date: Feb 2005
Location: Manchester N.H.
Posts: 760
Default

Totally forgot about that berlin smell...
Reply With Quote
  #10  
Old 01-06-2013, 09:10 PM
Wind Knot Wind Knot is offline
Member
 
Join Date: Jul 2011
Location: Amherst, NH
Posts: 56
Default

Quote:
Originally Posted by bushbuck View Post
I think sometimes we forget the advancements we have made, although we have much further to go.
Bushbuck,
Agreed; progress may be slower than we like, but I do believe it's in the right direction!
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:48 AM.



Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2017, vBulletin Solutions Inc.